Availability: | |
---|---|
Quantity: | |
WTEM-2
Gold
Product Description
Cities use WTEM-2’s 4D monitoring to map subway tunnels, utility corridors, and sinkhole risks – saving $2.6M/km in emergency repairs through predictive maintenance.
Urban Optimization Tools
High-Resolution Scanning
Buried utility mapping: Locates pipes/cables at 8m depth
Void detection: Identifies cavities >0.5m³ under roads
Smart Compliance
Auto-GIS integration: Updates city digital twins in real-time
Permit validation: Flags unregistered infrastructure
Traffic Optimization
Road stability scoring: Prioritizes repair schedules
Excavation risk alerts: Warns contractors of hidden hazards
Urban Efficiency Gains
Application | WTEM-2 Benefit | Traditional Cost |
---|---|---|
Utility Mapping | $120/km | $4,500/km (manual) |
Sinkhole Prevention | $380k savings/event | $1.8M repair avg. |
Project Delays | 0% missed hazards | 22% rework rate |
Data Freshness | Real-time updates | 3-year outdated records |
Regulatory Fines | Zero violations | $150k/year avg. |